Beautiful Virgin Islands

Wednesday, May 13, 2026

Bye-bye plywood! Local design company inks $2M million for exterior works to Admin Complex

Bye-bye plywood! Local design company inks $2M million for exterior works to Admin Complex

Government has awarded a local design company a $2,092,037.52 contract for the installation of exterior fixtures to the Ralph T O’Neal Administration Complex.

As the winning bidder for the project, Design BVI Limited will be responsible to procure and install impact-resistant windows, doors and frames on the building.

Speaking at the contract signing ceremony on Tuesday, Works Minister Kye Rymer said the contract is a revision of the initial-intended amount which had been agreed on earlier this year. He said it saved government more than $200,000.

“On 12th February 2020, the Cabinet of the Virgin Islands agreed to award a contract to Design BVI Limited for the amount of $2,328,082.77 subject to negotiations. Subsequent negotiations with Design BVI Limited saw a reduction in the cost to the contract amount of $2,092,037.52 which is a savings of $236,045.25,” he explained.

Scope of works expected


Ryme said that the works will represent a substantial improvement on the appearance of the complex as many of its glass doors and windows were either blown in or severely damaged during the 2017 hurricanes.

He added that following the disaster, a number of temporary plywood barriers were constructed within the complex which will now have to be removed.

“There is great need to remove and replace all temporary plywood barriers and damaged glass to restore and upgrade all windows and doors,” he stated.

Works to begin in December


Despite the contract being awarded this month, Rymer said a number of factors have resulted in a confirmed December date being set for the commencement of works.

“We are cognizant that we are in the peak of the hurricane season and do not want to increase our liability by undertaking major works of this type during this season. Also, there is a design review and procurement process for these customised windows, glass windows and doors that is likely to take a few months,” the minister explained.

Newsletter

Related Articles

Beautiful Virgin Islands
0:00
0:00
Close
The Great Western Exit: Why Best Citizens Are Fleeing the Rich World [PODCAST]
The New Robber Barons of Intelligence: Are AI Bosses More Powerful Than Rockefeller?
The End of the Old Order [Podcast]
Britain’s Democracy Is Now a Costume
The AI Gold Rush Is Coming for America’s Last Open Spaces [Podcast]
The Pentagon’s AI Squeeze: Eight Tech Giants Get In, Anthropic Gets Shut Out [Podcast]
The War Map: Professor Jiang’s Dark Theory of Iran, Trump, China, Russia, Israel, and the Coming Global Shock [Podcast]
Labour Is No Longer a National Party [Podcast]
AI Isn’t Stealing Your Job. It’s Dismantling It Piece by Piece.
Lawyers vs Engineers: Why China Builds While America Litigates [Podcast]
Churchill’s Glass: The Drunk, the Doctor, and the Myth Britain Refuses to Sober Up From
Apple issues an unusual warning: this is how your iPhone can be hacked without you doing anything
The Met Gala Meets the Age of Billionaire Backlash
Russian Oligarch’s Superyacht Crosses Hormuz via Iran-Controlled Route
Gunfire Disrupts White House Correspondents’ Dinner as Trump Is Evacuated
A Leak, a King, and a Fracturing Alliance
Inside the Gates Foundation Turmoil: Layoffs, Scrutiny, and the Cost of Reputational Risk
UK Biobank Breach Exposes Health Data of 500,000, Listed for Sale on Chinese Platform
KPMG Cuts Around 10% of US Audit Partners After Failed Exit Push
French Police Probe Suspected Weather-Data Tampering After Unusual Polymarket Bets on Paris Temperatures
News Roundup
Microsoft lost 2.5 millions users (French government) to Linux
Privacy Problems in Microsoft Windows OS
News roundup
Péter András Magyar and the Strategic Reset of Hungary
Hungary After the Landslide — A Strategic Reset in Europe
×